AS4

EUDAMED Is Live: What Legacy Device Manufacturers Need to Know

EUDAMED legacy device registration explained: the 27 November 2026 deadline, actor registration, upload options (GUI, XML, M2M) and AS4 access points.

Adeesha Jayasinghe

Adeesha Jayasinghe

Published: 25 Nov 2026

Blog image

TL;DR: EUDAMED’s Actor, UDI/Device, Notified Bodies and Certificates, and Market Surveillance modules became mandatory on May 28, 2026. Legacy devices placed on the EU market before that date and still being placed on the market afterward must be registered in the UDI/DEV module by November 27, 2026. Manufacturers can register through the web interface, XML bulk upload, or machine-to-machine (M2M) integration, which requires an AS4 Access Point on the CEF eDelivery network.

The European database on medical devices (EUDAMED) is no longer a theoretical compliance requirement. On November 27, 2025, the European Commission published Decision 2025/2371 in the Official Journal of the European Union, confirming that four core EUDAMED modules are fully functional. This official publication started a six-month transition period under Regulation 2024/1860. On May 28, 2026, using these functional modules became mandatory across the European Economic Area.

While new medical devices certified under the Medical Device Regulation (MDR) and In Vitro Diagnostic Regulation (IVDR) must be registered before market entry, manufacturers of legacy devices face a separate crucial deadline. Devices already on the market that benefit from extended transitional periods must complete registration in EUDAMED by November 27, 2026. Meeting these compliance deadlines requires a clear understanding of regulatory schedules, data governance standards, and technical connectivity options such as the AS4 communication protocol.

Regulatory Context and the Gradual Rollout Architecture

Under the original framework of regulation (EU) 2017/745 (MDR) and regulation (EU) 2017/746 (IVDR), EUDAMED was intended to launch as a single platform containing six fully integrated modules. However, development complexities made it difficult to release all six modules at the same time. To prevent compliance bottlenecks and improve market transparency sooner, the European Parliament and Council enacted Regulation 2024/1860, which authorized a gradual, module-by-module deployment. Under this modified approach, individual modules undergo independent audits by the European Commission. Once an audit confirms full technical functionality, the Commission publishes an official notice in the Official Journal of the European Union.

The publication of Commission Decision 2025/2371 on November 27, 2025, formally confirmed that the first four modules met all design specifications. These operational modules include Actor Registration, Unique Device Identification and Device Registration (UDI/DEV), Notified Bodies and Certificates, and Market Surveillance. The remaining two modules, covering Vigilance/Post-Market Surveillance and Clinical Investigations/Performance Studies remain under development and are scheduled for mandatory release in 2027. This phased rollout allows economic operators to adapt their data systems step by step rather than managing a simultaneous transition across all regulatory functions.

EUDAMED Deadlines and Legacy Device Rules

The official notice published on November 27, 2025, activated specific countdown periods for different user groups and product categories. Understanding how these dates apply to specific portfolios is essential for maintaining legal market access.

EUDAMED Module Target Stakeholder Mandatory Enforcement Date Core Compliance Requirement
Actor Registration (ACT) All Economic Operators May 28, 2026 Register organizational details and obtain a validated Single Registration Number (SRN).
New MDR/IVDR Devices Manufacturers & Authorized Reps May 28, 2026 Register Basic UDI-DI and device attributes before placing the first unit on the market.
Market Surveillance (MSU) Competent Authorities May 28, 2026 Use the module for cross-border surveillance coordination and official communication.
Ongoing Legacy Devices Manufacturers & Authorized Reps November 27, 2026 Complete full UDI registration for legacy devices placed on the market before May 28, 2026, that continue to be distributed.
Notified Body Certificates Notified Bodies May 27, 2027 Upload active historical MDR and IVDR certificates issued prior to mandatory system use.

The May 28, 2026, deadline establishes an immediate market entry requirement for new medical technology. Any new device certified under MDR or IVDR must be registered in EUDAMED before the first unit can be lawfully placed on the European market.

Legacy devices follow a separate timeline. These are products approved under former directives that remain legally on the market during transitional extensions. If a legacy device entered the EU market before May 28, 2026, and will continue to be placed on the market afterward, manufacturers have until November 27, 2026, to complete its device registration. Some sources cite November 28, 2026, because the 12-month period runs from the November 27, 2025 notice, so treat November 27 as the safe cut-off. Devices with no units placed on the market from May 28, 2026, generally do not require registration unless a post-market surveillance or vigilance action, such as a serious incident report or field safety corrective action, applies.

Actor Registration and Account Governance

Establishing actor credentials is the prerequisite for all interactions within EUDAMED. Economic operators including EU manufacturers, non-EU manufacturers, Authorized Representatives, importers, and System/Procedure Pack Producers must complete registration in the Actor module to receive a Single Registration Number (SRN).

The actor registration workflow begins when an organization creates an EU Login account through the Commission’s web portal. The first person to submit an actor registration on behalf of an organization automatically becomes the initial Local Actor Administrator. The submission must include corporate details, trade names, physical addresses, organizational roles, and details regarding the Person Responsible for Regulatory Compliance (PRRC).

The validation pathway depends on where the economic operator is established:

  • For EU-based operators, the registration request routes directly to the national Competent Authority where the company resides. The authority reviews the corporate data and issues the SRN upon approval.
  • For non-EU manufacturers, the registration routes first to their designated European Authorized Representative. The Authorized Representative verifies the corporate credentials and legal mandate before forwarding the application to their own national Competent Authority for final approval and SRN generation.

EUDAMED Submission Options: GUI, XML Bulk Upload and M2M

Once actor registration completes, companies must select a technical method to upload device data into the UDI/DEV module. Registering a device family requires linking four related objects: the Basic UDI-DI (the regulatory anchor for devices sharing the same purpose and risk class), individual UDI-DIs (commercial package codes), attribute datasets, and notified body certificates. EUDAMED provides three upload methods to accommodate different portfolio sizes. As a rule of thumb, the table below shows which method suits each portfolio size.

Technical Metric Manual Web Interface (GUI) XML Bulk Upload (BLK) Machine-to-Machine (M2M)
Portfolio Size Suitability Small portfolios under 100 devices Mid-sized portfolios between 100 and 1,000 devices Enterprise portfolios exceeding 1,000 devices
Operational Mechanism Direct manual data entry into web forms Browser-based upload of pre-formed XML files Direct server-to-server automated streaming via AS4
Technical Requirements Standard internet browser and EU Login account Offline XML generator and schema validation tools CEF eDelivery Access Point and compliant AS4 software
Validation Mechanism Immediate browser form checks Pre-upload XML schema verification Automated two-tier validation engine
Operational Error Risk High risk of typing errors and long processing times Moderate risk during manual file handling Minimal risk due to automated system-to-system validation

Manual entry through the web interface works well for small product catalogs, but manual typing becomes slow and error-prone as product volumes increase. The XML Bulk Upload pathway allows mid-sized companies to prepare product data offline and upload files through the portal. However, Bulk Upload limits files to 300 device entities per transmission. Large catalogs must be split into multiple files, which increases manual file handling.

For companies managing large product lines or multiple international brand portfolios, Machine-to-Machine (M2M) integration offers the most reliable long-term solution. M2M connects corporate Enterprise Resource Planning (ERP) or Product Lifecycle Management (PLM) databases directly to EUDAMED, eliminating manual file uploads.

Regardless of the submission method, all incoming product data must pass two strict validation checks:

  1. XML Schema (XSD) Validation checks that the file structure and syntax match the official technical specifications.
  2. Backend Business Rules Validation evaluates data against hundreds of logical dependencies. For instance, the system verifies that the selected risk class matches the assigned Notified Body certification and confirms that specific product attributes align with regulatory requirements.

Because missing fields or incorrect attributes cause full submission rejections, organizations must validate their documents thoroughly before uploading.

Understanding AS4 and CEF eDelivery for EUDAMED M2M

To enable automated M2M communication, the European Commission mandates the use of the Applicability Statement 4 (AS4) protocol. This communication standard operates across the Connecting Europe Facility (CEF) eDelivery network, using the e-SENS profile to guarantee secure, encrypted, and reliable data delivery.

The M2M exchange topology relies on three main technical components:

  • Organization Backend System: Internal corporate databases where device records are gathered, cleaned, and formatted into EUDAMED-compliant XML payloads.
  • Access Point (AP): A dedicated gateway on the manufacturer’s network or hosted by a service provider that packages XML payloads into secure SOAP messages and transfers using AS4 protocol.
  • EUDAMED Backend System: The primary database that receives messages, checks access rights, enforces business rules, and sends confirmation responses back to the sender.

Comparing protocols for healthcare data? Read AS2 vs AS4 in healthcare →

EUDAMED M2M architecture: organization backend system, AS4 Access Point and EUDAMED backend system

Setting up an active M2M connection requires completing several implementation steps:

  • Generating and managing public and private digital security keys.
  • Connecting to the official EUDAMED Testing and Playground environment.
  • Performing integration tests, including registering test device records, to confirm message delivery and response handling.
  • Submitting technical verification documents to gain access to the live production network.

Building an in-house AS4 Access Point requires significant IT resources and ongoing software maintenance. Because of this technical complexity, many manufacturers choose to connect through specialized third-party software providers. These providers maintain pre-configured Access Points that handle schema updates and cryptographic protocols, allowing regulatory teams to focus on master data accuracy. See how Aayu AS4 Server connects manufacturers to EUDAMED →

Implementation Plan for EUDAMED Compliance

To prepare for upcoming enforcement dates, medical technology companies should implement a clear five-step action plan.

  1. Complete actor registration immediately. Ensure that the company’s SRN is active and confirm that at least two Local Actor Administrators have access rights. Audit all product lines to classify every product as either a new MDR/IVDR device or an ongoing legacy product.
  2. Review and clean device master data. Map each device to its identifiers (Basic UDI-DI and UDI-DI for MDR/IVDR devices, EUDAMED-DI for legacy devices) and check product attributes against EUDAMED business rules. Pre-validate product records using software tools to fix formatting errors before submission.
  3. Select and configure the submission pathway. Companies with medium to large product portfolios should evaluate AS4 Access Point solutions. Test message flows in the EUDAMED Playground environment to verify data transfer accuracy.
  4. Manage submission deadlines and ongoing updates. Ensure all new MDR and IVDR devices are registered before placing them on the market after May 28, 2026. Register all legacy devices before November 27, 2026.
  5. Finally, establish internal change-control procedures so that future device modifications, certificate updates, and regulatory filings update EUDAMED automatically.

Registering a large portfolio through M2M? Aayu AS4 Server provides an AS4 Access Point for EUDAMED, so your regulatory team can focus on device data instead of protocol maintenance. Talk to our team.

What Happens After November 27, 2026?

November 27, 2026, closes the EUDAMED registration window for existing devices, not your ongoing regulatory obligations. Any legacy device still placed on the EU market requires UDI/DEV registration, with no grace period, unless the same device is already registered under the MDR or IVDR. Teams finishing late submissions should immediately prioritize devices actively being placed on the EU market.

Registration is also not a one-time task. Device modifications, certificate updates, and changes to product attributes must be reflected in EUDAMED over time. This is where internal change-control procedures, and automated M2M submissions for larger portfolios, keep records accurate without repeated manual work.

FAQ: EUDAMED Legacy Device Registration

What is the EUDAMED deadline for legacy devices?

Legacy devices placed on the EU market before May 28, 2026, that continue to be placed on the market afterward must be registered in the EUDAMED UDI/DEV module by November 27, 2026. Some sources cite November 28, so treat November 27 as the safe cut-off.

Do discontinued legacy devices need to be registered?

Generally no. Devices with no units placed on the market from May 28, 2026, do not need registration, unless a post-market surveillance or vigilance action, such as a serious incident report or field safety corrective action, arises.

Which EUDAMED modules are mandatory?

Four modules have been mandatory since May 28, 2026: Actor Registration, UDI/Device Registration, Notified Bodies and Certificates, and Market Surveillance. The Vigilance and Clinical Investigation modules are still under development.

What is the difference between XML bulk upload and M2M?

XML bulk upload lets you prepare device data offline and upload files through the EUDAMED portal. Machine-to-machine (M2M) integration connects your ERP or PLM system directly to EUDAMED over AS4, removing manual file handling, which suits large portfolios.

Do I need AS4 to register devices in EUDAMED?

Only for M2M integration. The web interface and XML bulk upload work through a browser with an EU Login account. M2M requires an AS4 Access Point on the CEF eDelivery network, which you can build in-house or use through a provider.

Adeesha Jayasinghe

Adeesha Jayasinghe

Adeesha is a Software Engineer at Aayu Technologies with around one year of experience, specializing in full-stack development. Driven by a curiosity for the “how” and “why,” he is passionate about research, exploring innovative ideas, and tackling complex problem-solving challenges. When he isn’t building software, Adeesha enjoys unwinding with a good book or watching movies.
Talk to an EDI Expert
Stay Compliant. Stay Connected. Powered by AS2.

Join hundreds of organizations already taking full control of their B2B AS2 communications with our trusted solutions. Contact us today to tailor a solution that fits your specific AS2 EDI needs.

Request a demo and take a live look at all the features of our AS2 EDI solutions.
Get answers to your questions and explore customizations that we can offer tailored specifically for you.
Get to know the dedicated deployment option available for your specific use cases.
Loading...
Please wait...

We're processing your request

Related Articles

View All Blogs
Explore our product stack

Try before you commit. 30 days, no credit card needed

Get full access to whichever product fits your needs. Configure real trading partner connections, run end-to-end transactions, and see the platform perform before making any commitment. All three products include a free 30-day trial with no restrictions.

Aayu logomark
Driving Innovation, Simplifying Connections.
EDI via AS2
30-day Free Trial
Secure and Compliant